Castle Manor Nursing Home

Client Name: Castlemanor Nursing Home

Architect:
David McCormack

Main Contractor:
Murtagh Construction

Consultant Engineers:
RN Murphy & Associates

Status: Complete
Mechanical & Electrical Installation

LMS installed both the Mechanical and Electrical Installation to this 70 bed nursing home Alzheimer’s unit, all bedrooms are en-suite, numerous day rooms, kitchen, comms room, sluice rooms, the main heat source is a 350 kw wood chip boiler with gas boiler back up. There is heat recovery throughout and 60m² of solar for hot water; this building thrives on renewable energy. The complete electrical installation has low energy consumption.

Works consisted of

  • Installation of wood chip boiler and accessories
  • Installation of a total HRU ventilation system
  • Installation of a/c to comm.’s room and meeting rooms
  • Installation of LPHW, water services, soils and wastes pipe work
  • Installation of 60m² solar systems
  • Installation of complete electrical services

This nursing home built on the outskirts of Cavan is located within a retirement village. It prides itself on its renewable capacity and extradionary finishes